As for knowing the performance that must be improved or less satisfactory, the IPA method is used.įrom the research results obtained based on the CSI method, Planning Document Indicators got 61.51% (Quite Satisfied), Planning Performance Indicators got 70.01% (Satisfied), and Indicators of Understanding of Planning References got 62.63% (Quite Satisfied). To determine the level of performance satisfaction used CSI method. This study aims to analyze the performance of planning consultants on indicators of planning documents, indicators of planning performance, and indicators of understanding of planning references. The results of planning often find errors in road handling methods and volume inaccuracies between planning and field conditions. Planning consultant, CSI, Performance Abstract Department of Civil Engineering, Faculty of Engineering, Lambung Mangkurat University
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |